17.10.2022 13:35
Back to overview
Reduction of gas transport at IP (Bocholtz Entry) - Update
Düsseldorf, 17.10.2022 - 13:35
The planned OGE maintenance works were cancelled. Fluxys TENP has made the capacities at the IP (Bocholtz Entry) for gas day 17.10.2022 available from 14:00.