26.05.2022 15:30
Back to overview
The intervention announced with UMM published on 09.05.2022 16:20 “Physical flows at the point Greifswald-NEL 03/06/2022 6.00 AM CEST to 01/07/2022 6:00 AM CEST “ has been dismissed.
Text of the original UMM:
Physical flows at the point Greifswald-NEL may be fluctuating from 03/06/2022 6.00 AM CEST to 01/07/2022 6:00 AM CEST due to maintenance measures scheduled by the upstream TSO. Fluxys Deutschland capacities booked at the IP Greifswald-NEL are not affected by these measures. Information can also be found online in the company’s transparency tool.