Technical available capacities

Maximum technical capacities available on the TENP pipeline

Interconnection Point Direction Capacity [kWh/h]
Eynatten (1) Entry 1.590.630
  Exit 3.396.000
Bocholtz (1) Entry 15.300.000
Wallbach Exit 15.300.000
(1) Bundled interconnection point

 

Maximum technical capacities available on the NEL pipeline, EUGAL pipeline and OAL pipeline

Interconnection Point NEL pipeline Direction Capacity [kWh/h]
Greifswald Entry 6.831.286
Interconnection Point EUGAL pipeline Direction Capacity [kWh/h]
Lubmin II Entry 11.972.001
Deutschneudorf EUGAL Brandov FLX (1) Exit 7.694.720
Interconnection Point OAL pipeline Direction Capacity [kWh/h]
Baltic Energy Gate – Fluxys Entry 4.000.000
(1) Bundled interconnection point